Critical Path Method (CPM), a planning and controlling technique, is widely used in the construction industry. However, CPM is criticized for its lack of workflow and inability to schedule continuous resource usage. Location-Based Management System (LBMS) fill these gaps and has been implemented in many construction projects. We propose that LBMS will improve schedules and project performance, addressing CPM's main shortcomings. This study is composed of three case studies. CPM schedules were analyzed and were improved using LBMS tools. The resulting schedules show improved workflows, crew balancing, resource usage and had fewer interruptions, without affecting project duration. Furthermore, LBMS schedules were optimized with only a few scheduling operations and fewer planning elements. The computational benefit of LBMS increases with the number of locations and tasks in a schedule. Project managers will benefit from a simpler scheduling process and better resource flow.
a a department of Civil engineering, aalto university school of engineering, espoo, Finland;b Construction Management research Laboratory (LagerCon), department of architecture and Building, school of Civil engineering, architecture and urban design, university of Campinas (uniCaMP), Campinas, Brazil ABSTRACT Modularization has recently attracted considerable interest among academics and practitioners. In the construction industry, several modular solutions have been introduced and examined; however, hardly any study comprehensively classifies the different modularization strategies according to their possibility to achieve various objectives of building investments. This research aims to develop a framework for identifying and classifying modularization strategies in construction according to their suitability to achieve the specific outcomes intended for a building or its subsystem. Using the literature on product modularity, product platforms and production strategies as a basis, this study has developed a theoretical framework that proposes connections between the main objectives of a building investment and the dimensions of modularization strategies. The framework is elaborated by testing the propositions, based on an empirical analysis of nine real-life case studies. The findings reveal that modularization can be a suitable approach to develop an innovative design solution; improve a project's quality, cost and schedule performance; and enable flexibility in building use and maintenance. However, suggestions for achieving these objectives vary from project organizationdriven to collaborative, integrated or supplier-driven modularization strategies. Developers, owners, contractors and module suppliers can use the framework when positioning and developing their roles in the construction supply chain.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.