The key issue to develop the Roncador field, located in ultra deep water offshore Campos Basin, in Brazil, is the maximization of production rate keeping the completion reliability, avoiding premature high workover costs involved in that scenario. Roncador reservoir has a succession of thick turbidite sandstones containing 31° API oil, requiring sand control and water injection to maintain reservoir pressures above saturation's. The distance between the pay zones are as short as 12 meters, becoming the first problem to fit the gravel assembly in such a short space. Flexibility in the completion is provided by an internal string with sliding sleeves. When water coning occurs in any zone, the sleeves shall be closed using slick line in a light workover. The paper will describe the main challenges to carry out three stacked frac-packs in a subsea well drilled in water depths above 1800 m, considering the experience acquired from the first three deviated subsea wells, working in dynamic positioned rigs. Special procedures were adopted to prevent failures during the completion, such as: rigid control of fluid cleanness and gel properties, selection and operation of service tools suitable to that environment (heaving, risk of rig drive-off) and careful design for frac-pack based on minifrac data. The drives for equipment selection will be reviewed, including the choice of perforation charges, gravel equipment and sliding sleeves. The good results obtained in those frac-packs, using the Tip Screen Out technique, reducing the skin effect compared to conventional gravel pack, will be presented too. Introduction Roncador field was discovered in October 1996 by the wildcat RJS-436. The 132 square kilometers field lies 125 kilometers off the coast of Rio de Janeiro, at water depths ranging from 1,500 to 2,000 meters (Fig. 1). The field size, the good quality of crude and the concurrent benefits for the downstream, allied to economic results of the project, led the Company to adopt a fast track development plan. In January 1998 another wildcat, RJS-513, confirmed the extension of the reservoir and the existence of oil in the southwestern portion of the reservoir. Immediately afterwards, Petrobras began the appraisal of the reservoir, drilling four other wells. In this same year the Early Production System (EPS) was designed to allow a long duration test in the wildcat RJS-436. Three major developments made this EPS viable: the Drill Pipe Riser2, the Guidelineless Christmas Tree with vertical production2 and the upgrade in FPSO Seillean3 to 2000 m water depth. The stacked frac-pack was deemed the solution required to obtain the desired flow rate in this vertical well, allowing long term appraisal with good economical results. In January 1999 the first oil came on stream in Roncador, when the Early Production System began producing through RJS-436 at a rate of 20,000 barrels of a light oil per day. This System is installed at 1,853 meters of water depth, being the current world record for a subsea completion. Background The wildcat well (RJS-436) was tested, indicating that sand control would be required. to develop the field. The sand control method planed was the frac-pack, defined here as the combination of fracturing the formation followed by an annulus packing. This choice was based upon two mean reasons:the excellent background of this method in Campos Basin andthe excellent results obtained in wildcat well by using frac-pack system. (i) Generally, Campos Basin sandstones are highly unconsolidated and have permeabilities ranging from medium to ultra-high values. In high permeabilities, damaging the well by sand controlling, no matter the method, is very common.
Campos Basin, during the last 40 years, has been the stage where the technology development has played its main game in terms of pushing the offshore oil and gas production to overcome its challenges to go deeper and deeper in WDs never experienced before. Incremental, innovative, enabler or even disruptive technologies, supported by a strong commitment to success and the capability and drive for field test new ideas have made such a difference. Structured actions based on technology programs specific created for reaching defined targets, such as Petrobras Deep and Ultra Deep Water Technology Program named PROCAP, in its four sequential "versions" for over 28 years, resulted in two OTC Awards, in 92 and 2001, and helped Petrobras to achieve an important position worldwide in offshore production. A focused projection of the future in terms of the next generation under development to overcame challenges related to revitalization of Campos Basin mature fields, such as life extension methodologies, heavy oil processing, oil and gas contaminants treatment, subsea boosting and separation systems, power distribution and transmission, that are part of Petrobras technologies "gold list" are being developed and they will be available in the next couple of years. Additionally, an internal program, named Subsea Operational Technologies, has been developed to promote a full integration among suppliers, R&D and operation teams to reduce OPEX and enhance oil and gas production in Campos Basin. Also, associated to that, a strong and efficient integrated operation control has promoted the required offshore field management drive and safety. This paper will present a retrospective of the most significant Subsea system, Well Drilling and Completion, as well as Topsides technologies developed and deployed in the Campos Basin for more than 80 production systems in more than 30 oil and gas fields development.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.