The principal commercial requirement of any manufacturing system is directed towards a growth in productivity. One of the options for achieving higher productivity is reducing the cycle time. Cycle time comprises of the following time element: operation, loading/unloading, setup and idleness. In this work a case study of a reputed construction equipment manufacturing company of India is considered where in it was observed that the demand for the 4Ton compactors remained unmet as there were no dedicated fixtures for the tack welding operation of those compactors. This welding work was being performed using hook and carrier by trial and error method. This led to inefficient utilization of man, machine, money and increase in manufacturing time. So there was a need to design the dedicated fixture so as to reduce the cycle time of tack welding operation. Benefits of this new fixture are twofold. It reduces setup time because it eliminates marking for each job, positioning by trial and error method and hence increases the productivity of 4Ton compactor. Also, usage of fixture calls for semiskilled labor instead of skilled labor, reducing labor cost for improved production rate.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.