Cluster drilling comes with its own attendant challenges; however, operators usually adopt this option in order to reduce environmental footprint and optimize cost. Drilling additional wells in an existing cluster will require simultaneous operation in order to maximize value. The philosophy underlying the rules for SIMOPS is that the interactions between operations must remain manageable (and can be demonstrated to be so) under all conditions that can be realistically foreseen. This paper focuses on four (4) activities that delivered the Ogini field HSE-Case, whose primary objective was to generate an in-house risk assessment and hazard register for Simultaneous Operations (SIMOPS) involved in drilling of the five (5) new Ogini wells namely:- Operational description of Ogini SIMOPS project, Description of HSE-MS, Risk Assessment and Remedial Action Plan (RAP). The SIMOPS for Ogini-field was limited to those activities associated with oil production from the existing wells, drilling operations and laying of flowlines for tie-in of new wells to the flowstation for production. The Ogini SIMOPS have several HSE components that require critical review; a multi-disciplinary team was constituted to assess/evaluate the Risks and generate a Hazard register used in Simultaneous Operations Planning (SIMOPS) for the project. The Scope of work of the team included coming up with the industry-acceptable strategies to carry out the following operations simultaneously viz:- Flowline Construction, Rig Move, Well Delivery and Production. A SIMOPS Planning was developed by NPDC Team and approved by DPR. Five (5) horizontal wells were drilled in a cluster (of 4.5m apart) with two producing wells; hooking up the new wells to production facility sequentially while rig was still on site. Following the review of the distances between the planned five wells and considering future intervention works in this location, after drilling and completion of first two wells, the rig was skidded some meters further away from the initial surface location to drill the subsequent wells. Extended well test was carried out on these completed wells during this operation. This reduced the identified risks associated with SIMOPS and also provided accelerated returns on initial investments.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.