Many large wells have been drilled in the Gulf of Mexico's Lower Tertiary play. These wells are completed with single-trip multizone systems, and they have gross perforated lengths exceeding 1,500 ft. The main difficulty in perforating these wells is the high-pressure environment (~20,000 psi). Under these conditions, the challenges are to create sufficiently large entrance holes in the casing, minimize the high-risk of equipment damage due to gunshock, and minimize the amount of perforating debris created. Perforating several intervals in a single run is required to complement single-trip multizone systems. Perforating all zones simultaneously in one trip saves time and reduces risks when compared with stacked completions requiring multiple trips for each zone. Safety and cost reduction are extremely important in deepwater operations. Risk control is very important because gunshock and/or debris problems can lead to multimillion dollar losses in non-productive time, and in extreme cases, gunshock problems can lead to lost wells. To undertake these challenges, a new Low Perforating Shock and Debris (LPSD) gun system was used. In comparison with standard high-pressure guns, the LPSD gun system produces much less gunshock and negligible amounts of debris; thus, minimizing gunshock risk and reducing cleanup runs typically needed to recover perforating debris. LPSD guns produce negligible amounts of debris because LPSD guns contain all the metallic components, including the shaped charge cases, which remain virtually intact inside of the guns. A key element in planning these perforating jobs is gunshock prediction to evaluate if the equipment will be able to withstand the transient loads produced by the perforating guns. The gunshock prediction process is described in detail in this paper. For a typical 4-zone 1,500 ft gross length perforating job, the time needed from picking up the first gun to laying out the last gun averages 84 hours. All zones are simultaneously perforated, which eliminates three perforating runs per well, saving approximately 9.2 days per well while minimizing personnel exposure. By perforating the largest high-pressure wells in the Gulf of Mexico's Lower-Tertiary play with LPSD guns, we minimized personnel exposure, minimized debris and reduced execution time up to 72%.
The largest deepwater wells in the Gulf of Mexico have been drilled in the Lower Tertiary play. Most of these wells are completed with single-trip multizone systems have gross perforated lengths exceeding 1,500 ft. The main difficulty in perforating these wells is the ~20,000 psi high-pressure environment. Under these conditions, the challenges include creating sufficiently large entrance holes in the casing, minimizing the high-risk of equipment damage due to gunshock, and reducing the amount of perforating debris created. Perforating several intervals in a single run is required to complement single-trip multizone systems. Perforating all zones simultaneously in a single trip saves time and reduces risk when compared with stacked frac-pack completions requiring multiple trips for each zone. Safety and cost reduction are extremely important in deepwater operations. Risk control is very important because gunshock and/or debris problems can lead to multimillion dollar losses in nonproductive time, and in extreme cases, gunshock problems can lead to lost wells. To undertake these challenges, a new Low Perforating Shock and Debris (LPSD) gun system was used. In comparison with standard high-pressure guns, the LPSD gun system produces much less gunshock and negligible amounts of debris; thus, minimizing gunshock risk and reducing cleanup runs typically needed to recover perforating debris. LPSD guns produce negligible amounts of debris because LPSD guns retain all the metallic components inside the guns, including the shaped charge cases, which remain virtually intact inside of the guns. A key element in planning these perforating jobs is gunshock prediction to evaluate if the equipment will be able to withstand the transient loads produced by the perforating guns. The gunshock prediction process is described in detail in this paper. For a typical 4- to 6-zone 1,500 ft gross length perforating job, the time needed from picking up the first gun to laying out the last gun averages 84 hours. All zones are simultaneously perforated, which eliminates at least three perforating runs per well, saving approximately 9.2 days per well while minimizing personnel exposure. By perforating the largest deepwater high-pressure wells in the Gulf of Mexico's Lower-Tertiary play with LPSD guns, we minimized personnel exposure, minimized debris and reduced execution time up to 72%.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.