SynopsisAn economic argument is presented for the incorporation of quantitative modelling of the uncertainty of grade, tonnage and geology into open-pit design and planning. Two new implementations of conditional simulation-the generalized sequential Gaussian simulation and direct block simulation-are outlined. An optimization study of a typical disseminated, lowgrade, epithermal, quartz breccia-type gold deposit is used to highlight the differences between the financial projections that may be obtained from a single orebody model and the range of outcomes produced when, for example, fifty deposit simulations are run. The effects on expectations of net present value, production cost per ounce, mill feed grade and ore tonnage are presented as examples and periods with a high risk of negative discounted cash flow are identified. Further integration of uncertainty into optimization algorithms will be needed to increase their efficacy.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.