Bloom and Gallant have proposed an elegant model for finding the optimal thermal schedule subject to matching the load duration curve and general linear constraints. Their method is based on a linear program with some linear equality constraints and many linear inequality constraints. There are well-documented specialized linear programming algorithms that are able to solve this problem. This paper proposes the extension of the Bloom and Gallant model to several successive intervals with constraints on generation encompassing different intervals. A procedure for finding an initial feasible point, which is an essential part of the solution procedure, is described here, together with details of the modeling of several operational constraints and computational results with real test cases.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.