A constructed wetland which was composed of aerobic and anaerobic areas was evaluated for 3 years to effectively treat the sewage produced in farming and fishing communities. For 3 years in a constructed wetland, biochemical oxygen demand(BOD), chemical oxygen demand(COD), suspended solids(SS), total nitrogen(T-N), and total phosphorus(T-P) in effluent were 0.2~11.8, 1.0~41.9, 1.1~6.5, 4~60 and 0.02~3.51 mg/L, respectively. Removal rate of BOD, COD and SS in effluent were 97, 92 and 99%, respectively, in the third year. As time goes by, removal rate of T-N and T-P in treated water in aerobic area and effluent were gradually increased in a constructed wetland. In the third year, removal rate in effluent were 62 and 73%, respectively. By the seasons, removal rate of BOD, COD, SS, T-N and T-P were 97~98, 87~91, 99, 43~61 and 76~86%, respectively. Removal rate of BOD, COD, SS and T-P were not affected by the seasons, but that of T-N in winter and spring were decreased than the other seasons.