<p>The Abraham Lincoln Bridge is a 3-tower cable-stayed bridge connecting Louisville, Kentucky to Jeffersonville, Indiana. The design included an innovative foundation layout, cable-stayed detailing that simplified construction, and probabilistic 100 year service life design. The design contemplated the construction approach preferred by the Design Build contractor. This collaborative approach between the designer and contractor was critical to achieving efficient design elements such as the anchor box, anchorages at the deck level, and tie downs. Yet, despite careful planning, challenges presented themselves during construction, such as deficiencies of concrete materials and difficulties during shaft construction. This paper takes an in depth look at these challenges that arose during construction as we endeavour to share the knowledge gained, not from what went well, but rather from our collective failures.</p>
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.