A technique for long-term generation scheduling is proposed for power systems with hydro power plants (HPPs). A mathematical formulation of the problem supposes the application of dynamic programming method. The results of yearly generation scheduling in the Electric power system (EPS) of Siberia show strong dependence of the total fuel cost on the optimal monthly electricity production by individual HPPs. The prices of the electricity generated during a year and under different water conditions are calculated for power plants of the EPS of Siberia. The possibility of implementing the long-term optimal generation schedules at power plants by setting the electricity prices is shown.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.