Plastic shrinkage cracking in concrete usually occurs during the first 5 hours after placing and therefore the mechanics of fibre reinforcement were studied during this period. Two types of polypropylene fibres were mixed at 0.1% by volume. The development of bond strengths and the stresses which the fibres could sustain across cracks were measured by uniaxial tensile tests during the first 5 hours after mixing. Fibre stresses up to 130 MPa at 5 hours were achieved which were equivalent to a composite post-crack strength of 65 kPa. Restrained ring tests were used to assess the amount of cracking which occurred during the first 24 hours in a different high strength mix and, although the results were very variable, the fibres were found to reduce the crack area by between 40% and 85% compared with plain concrete, depending on fibre type
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.