The 345 kV cables are predominantly forced cooled.Forced cooling is achieved through the installation of cooling plants. The main components of a cooling plant are the pumps, air-to-fluid heat exchangers, refrigeration equipment, and hydraulic system. Various stages of the cooling system provide different levels of transmission of Forced Cooled Transmission Cables then used to compute ratings.The model is composed of more than 1,600 sirnultaneous partial differential equations that are solved every 5 minutes by the central processing unit (CPU), which also refreshes the ratings at this rate. The CPU, located at the Sprain Brook Substation, obtains cable loading locally
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.