This paper investigates an integrated scheduling of production and distribution model in a supply chain consisting of a single machine, a customer, and a sufficient number of homogeneous capacitated vehicles. In this model, the customer places a set of orders, each of which has a given release date. All orders are first processed nonpreemptively on the machine and then batch delivered to the customer. Two variations of the model with different objective functions are studied: one is to minimize the arrival time of the last order plus total distribution cost and the other is to minimize total arrival time of the orders plus total distribution cost. For the former one, we provide a polynomial-time exact algorithm. For the latter one, due to its NP-hard property, we provide a heuristic with a worst-case ratio bound of 2.
In this paper we study scheduling with release times and job rejection on two parallel machines. In our scheduling model each job is either accepted and then processed by one of the two machines at or after its release time, or it is rejected and then a rejection penalty is paid. The objective is to minimize the makespan of the accepted job plus the total penalty of all rejected jobs. The scheduling problem is NP-hard in the ordinary sense. In this paper, we develop a 1.5 + -approximation algorithm for the problem, where is any given small positive constant.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.