In this paper the Job-shop problem is addressed as a support for a manufacturing system scheduling considering an energy consumption threshold that must not be exceeded. It is considered that an operation may consume a lot of energy at the beginning of the process (consumption peak), more than its consumption after a while, resulting in the consideration of an operation as two sub-operations. The goal is then to propose the best schedule considering the energy threshold, the consumptions of operations and duration of consumption peaks as given data. A linear model is proposed which model is based on a flow approach to solve simultaneously the power restriction and traditional time-based objectives of the Job-shop problem. An example of the schedule improvement considering consumption peaks rather than global consumption is given.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.