The paper describes the implementation of lead-rubber bearings as energy absorbers as part of the retrofit and upgrade of a large wharf. The key design requirement of the seismic retrofit was to ensure that the limited ductility capacity of the existing wharf piles was not exceeded. This was achieved by providing additional lateral restraint to the wharf in the form of groups of raking piles fastened to the wharf via post-tensioned lead-rubber bearings acting as energy absorbers.
The Mw 8.0 Pisco earthquake struck at 6.40pm local time with an epicentre offshore about 150 km south of Lima. At least 519 people were killed, and over 1,300 injured. Over 38,000 homes were destroyed and more than 100,000 were made homeless. 14 hospitals were destroyed and many other facilities damaged. The city of Pisco was worst affected with serious damage to the majority of adobe buildings. Other cities and towns nearby suffered similar damage to a lesser extent, depending on the distance from the epicentre. The capital Lima was not seriously affected, although there was some minor damage to buildings. Strong ground motions were felt for over two minutes. In this subduction earthquake a tsunami was generated and affected tens of kilometres of coast. The New Zealand Society for Earthquake Engineering Society (NZSEE) sent a 6-person reconnaissance team to Peru. The team spent three days in Lima meeting with key authorities and four days in the field observing some of the earthquake-affected area. This report describes the team’s observations and comments on the implications for earthquake engineering practice. Highlights of the event in the eyes of the team were: The long duration of the event – over 2 minutes of strong shaking The unique geotechnical context – no rainfall and sandy soils Significant liquefaction damage to roads and buildings Poor performance of adobe construction Generally good performance of reinforced concrete brick infill – but there were major collapses. Good performance of some unreinforced masonry buildings Widespread use of shear walls in major buildings in Lima Engineered structures generally performed well Damage to parts of Pan American Highway due to liquefaction Minimal damage to a major steel mill, designed to international standards Collapse and/or overload of telecom systems for up to four hours following the event, isolating Pisco and Ica Water and waste water systems and storage were seriously affected in Pisco, and significantly in Ica Port St Martin, serving Pisco, was seriously damaged but functional Coordination of overseas / international aid needs careful consideration as part of response planning. Management of response resources is critical. There were significant tsunami effects which were variable in height up to 10 metres. Relatively minor damage to architectural finishes and building services can render hospitals non-functional. Survival of industrial facilities was important in reducing social impact by saving jobs. The best of Peruvian earthquake engineering is international standard. The development of earthquake-resistant standards in schools over the last three decades has paid dividends with modern designs performing well.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.