In this paper a Genetic Algorithm (GA) approach is presented to solve the N-Jobs M-Machines Permutation Flow-Shop Scheduling Problem (PFSP) with Breakdown times. In comparison with other methods that start with a solution obtained with the Johnson's Algorithm (or another greedy approach), the presented GA method starts with randomly generated solutions and within 100 iterations is able to obtain a solution better than other methods. Also, while in other works the sequence of jobs to be processed in the machines is obtained prior to the occurrence of breakdown times, the GA finds the solution considering from the beginning the occurrence of the breakdown times. Thus, the presented GA method considers the effect of the breakdown times in the overall process. A selection of standard 20×20 PFSPs was used for validation of the GA, finding that in 86% of the selected PFSPs the GA was able to provide job sequences with better makespans when compared with another method. The makespan improvements were statistically significant at the 0.10 and 0.01 levels. Then, evaluation of the GA was performed on one PFSP case with breakdown times. As in the validation cases with standard PFSPs, the GA outperformed the results obtained with another method.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.