Existing and suggested approaches to development of staffing plans regarding infrastructure maintenance are analysed from the point of view of ensuring interests of a railway infrastructure company, using example of JSC Russian Railways.The existing methodology of planning workforce involved in maintenance of the railway infrastructure is based on the use of average values of parameters resulted from monitoring of the state of infrastructure structures, roadbed and track devices conducted monthly, as well as during autumn and spring continuous inspections and checks of the track. The received values of work to be performed only implicitly reflect the required number of workers, effective involvement in operation, and efficiency of each worker.The modern trend towards digitalisation and cybernation of all processes, when organising maintenance of the track infrastructure, provides for maximum social adaptation of production processes to requests of owners, tasks of organisers and interests of performers. Staff planning based only on the volume of work to be performed does not allow digitalisation and social cybernation of an individual performer.The syntagmatic component of such an algorithm is the monthly total worked time, which is determined by the actual engagement of each performer. The paradigmatic component of such models should be the same daily number of performers. The stage of preliminary assessment of application of the proposed algorithm for digitalisation and social cybernation of workforce planning supposed an increase in labour productivity, approximately by 20–25 %, an increase in quality of work and a more effective assessment of activities of each performer.
The method of predictive calculations of the state of the rails as the main element of assessing the state of the track when planning major repairs of the track is given. With a standard service life of 600 to 700 million tons gross, it is necessary to predict the number of defective rails on the track when increasing the service life to 1100 million tons gross (considering local rail replacement during intermediate repairs). The polygon for assigning repairs is determined by the number of “Windows” that can be provided per week on the section. The projected increase in the work of the track causes the need to increase life cycle cost depreciation charges for the formation of the repair Fund for capital repairs by 30-35%.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.