International audienceIn this article we present our contribution to the Rolling Stock Unit Management problem proposed for the ROADEF/EURO Challenge 2014. We propose a greedy algorithm to assign trains to departures. Our approach relies on a routing procedure using multi-interval constraint propagation to compute the individual schedules of trains within the railway station. This algorithm allows to build an initial solution, satisfying a significant subset of departures
In this paper, we study cyclic production for throughput optimization in robotic flow-shops. We are focusing on simple production cycles. Robotic cells can have a linear or a circular layout: most classical results on linear cells cannot be extended to circular cells, making it difficult to quantify the potential gain brought by the latter configuration. Moreover, though the problem of finding the best one part production cycle is polynomial for linear cells, it is NP-hard for circular cells. We consider the special case of circular balanced cells. We first consider three basic production cycles, and focus on one which is specific to circular cells, for which we establish the expression of the cycle time. Then, we provide a counterexample to a classical conjecture still open in this configuration. Finally, based on computational experiments, we make a conjecture on the dominance of a family of cycle, which could lead to a polynomial algorithm for finding the best 1-cycle for circular balanced cells.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.