For the majority of the contractual arrangements used in construction projects, the owner is not responsible for the cost deviations due to the variability of labor productivity or material price, amongst many other aspects. Consequently, the cost performance of a project may be entirely distinct for the owner and the contractor. Since the majority of quantitative research on cost estimation and deviation found in the literature adopts the owners’ perspective, this research provides a contribution towards modeling costs and cost deviation from a contractor’s perspective. From an initial sample of 13 residential buildings and 10 office building projects, it was possible to develop models for cost estimation at the early stage of development, including both endogenous and exogenous variables. Although the sample is relatively small, the authors were able to fully analyze all the cost data, using no secondary sources of data (which is very frequent in cost modeling studies). The statistically significant variables in the cost estimation models were the areas above and below ground and the years following the 2008 financial crisis, including the international bailout (2011–2014) period. For estimating the unit cost, a nonlinear model was obtained with the number of underground and total floor, the floor ratio, and the years following the 2008 financial crisis, including the international bailout (2011–2014) period as predictors. For the office buildings, a statistically significant correlation was also found between the cost deviation and number of underground floors.
For the majority of the contractual arrangements used in construction projects, the owner is not responsible for the cost deviations due to the variability of labor productivity or material price, amongst many other aspects. Consequently, the cost performance of a project may be entirely distinct for the owner and the contractor. Since the majority of the quantitative research on cost estimation and deviation found in the literature adopts the owners’ perspective, this research provides a contribution towards modelling costs and cost deviation from a contractors’ perspective. From an initial sample of 13 residential building and 10 office building projects, it was possible to develop models for cost estimation at the early stage of development including both endogenous and exogenous variables. Although the sample is relatively small, the authors were able to fully analyze all the cost data, using no secondary sources of data (very frequent in cost modelling studies). The statistically significant variables in the cost estimation models were the areas above and below ground and the years following the 2008 financial crisis, including the international bailout (2011-2014) period. For estimating the unit cost, a nonlinear model was obtained with the number of underground and total floor, the floor ratio and the years following the 2008 financial crisis, including the international bailout (2011-2014) period as predictors. For the office buildings, it was also found a statistically significant correlation between the cost deviation and the number of underground floors.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.