As a symbol language, toponyms have inherited the unique local historical culture in the long process of historical development. As the birthplace of Manchu, there are many toponyms originated from multi-ethnic groups (e.g., Manchu, Mongol, Korean, Hui, and Xibe) in Northeast China which possess unique cultural connotations. This study aimed to (1) establish a spatial-temporal database of toponyms in Northeast China using a multi-source data set, and identify their ethnic types and origin times; and (2) explore the geographical distribution characteristics of ethnic toponyms and the evolution of rural settlements by comparing the spatial analysis and spatial information entropy methods. The results found that toponyms reflect not only the spatial distribution characteristics of the density and direction of ethnic groups, but also the migration law of rural settlements. Results also confirm that toponyms contain unique cultural connotations and provide a theoretical basis for the protection and promotion of the cultural connotations of toponyms. This research provides an entropic perspective and method for exploring the spatial-temporal evolutionary characteristics of ethnic groups and toponym mapping.
An assembly line is an industrial arrangement of machines, equipment, and operators for continuous flow of workpieces in mass-production operations. In an assembly line balancing problem, tasks are allocated to workstations according to their processing times and precedence relationships amongst tasks. Nowadays, some research investigated the reliability of assembly production by taking account of task time uncertainties. Our research utilizes uncertainty theory to model task time uncertainties and introduces the belief reliability measure to the assembly line production for the first time. We proposed a multi-objective optimization model that aimed at maximizing the belief reliability and minimizing the cycle time. The problem is solved using a newly developed restart neighborhood search method. The numerical experiments are conducted to verify its efficiency. The methodology proposed in this paper is applicable to any industry (including the automotive industry) when the historical data on task processing times are very scarce. INDEX TERMS Assembly line balancing, belief reliability, neighborhood search, uncertain task times. A. ASSEMBLY LINE BALANCING WITH UNCERTAIN TASK TIMES Nowadays, ALBP with uncertain task times (ALBP-UT) receives a lot of attention in academia. Task time uncertainty may result from instability of the operator's work rates, the varied skills and motivations of workers, and the failure sensitivity of complex processes' uncertainty [3]. Suresh and Sahu [29] first introduced the task time uncertainty into ALBP and proposed a simulated annealing algorithm. Baykasoğlu and Özbakir [2] optimized a U-shaped ALBP-UT by genetic algorithm. Cakir et al. [6] proposed a hybrid simulated annealing algorithm to solve the multi-objective ALBP-UT. More recently, Delice et al. [7] developed a genetic algorithm to solve the two-sided U-shaped ALBP-UT. Li [12] solved the type-II ALBP-UT by a branch-and-bound
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.