This paper presents a novel hybrid approach for studying electric power systems as a combination of the electrical power generation process and the actual state of the transmission lines. The approach is composed of a discrete-event simulation model and a mathematical programming model. The simulation model is designed as a routing problem defined over a set of transmission lines considered (individually) as active, inactive, under maintenance, and outage. On the other hand, the mixed-integer lineal programming model determines the best way to generate and transmit power flows (considering, simultaneously, all possible solutions). This type of model allows solving the economic dispatch problem in lower computational times. It also ensures reaching the global optimum. When adding the discrete-event simulation model for studying the state of transmission lines, the final hybrid approach allows obtaining feasible solutions when the system parameters change. Here, both models (i.e., simulation and optimization models) are combined to improve the capabilities of the model structure to represent real-life scenarios. Our proposal is used to analyze a case study composed of an electric system with six buses, eleven lines, and three generators.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.