A mixed shop is a manufacturing infrastructure designed to process a mixture of a set of flowshop jobs and a set of open-shop jobs. Mixed shops are in general much more complex to schedule than flow-shops and open-shops, and have been studied since the 1980's. We consider the three machine proportionate mixed shop problem denoted as M 3 | prpt | C max , in which each job has equal processing times on all three machines. Koulamas and Kyparisis [European Journal of Operational Research, 243:70-74,2015] showed that the problem is solvable in polynomial time in some very special cases; for the non-solvable case, they proposed a 5/3-approximation algorithm. In this paper, we present an improved 4/3-approximation algorithm and show that this ratio of 4/3 is asymptotically tight; when the largest job is a flow-shop job, we present a fully polynomialtime approximation scheme (FPTAS). On the negative side, while the F 3 | prpt | C max problem is polynomial-time solvable, we show an interesting hardness result that adding one open-shop job to the job set makes the problem NP-hard if this open-shop job is larger than any flow-shop job. We are able to design an FPTAS for this special case too. Figure 5.1: A feasible schedule π for the constructed instance of the M 3 | prpt | C max problem, when the set S can be partitioned into two equal parts S 1 and S 2 . The partition of the flow-shop jobs {J 1 , J 2 } is correspondingly constructed. In the schedule, the jobs of J 1 and the jobs of J 2 are processed in the LPT order, respectively.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.