Risk assessment is one of the most important factors in achieving success in public-private partnership (PPP) projects. Some relationships between risks in freeway projects have been established. The occurrence of each risk can worsen the effects of others such as a negative impact of financial risks on construction risks. This paper is aimed at prioritizing significant risks in freeway PPP projects applying a fuzzy analytic network process (FANP) method for overcoming the problems of interdependencies and feedback among different risk-ranking alternatives. Data on the study have been collected through a literature review, an interview and a questionnaire survey distributed to experts in the field of freeway PPP projects. The obtained results have shown that financial, legal and political risks are the most significant groups, although improper design, changes in the value of granted lands and the termination of concession are the most important risks. The findings help with strengthening the capabilities of developing countries for risk management in freeway PPP projects.
The coronavirus outbreak has created a global health crisis that has disrupted all industries, including the construction industry. Following the onset of the pandemic, construction workers faced and continue to face unprecedented safety and health challenges. Therefore, construction employers established new safety precautions to protect the health and safety of the workforce and minimize the spread of the virus. The new precautions followed the advice and guidelines offered by different health and safety agencies like the Occupational Safety and Health Administration (OSHA), Centers of Disease Control and Prevention (CDC), and the Associated General Contractors of America (AGC). With construction projects resuming operations, it becomes important to analyze the coronavirus-related health and safety concerns of construction workforce and understand how the new safety procedures can assist on jobsites. Existing studies mostly focused on interviews and surveys with construction companies to understand the impact on project performance and supply chains. However, no study has yet to analyze the United States construction workforce. This paper fills the gap by providing a qualitative descriptive analysis of the COVID-19 complaints data gathered by OSHA from construction jobsites. Information gathered by OSHA includes the jobsite location, the North American Industry Classification System (NAICS) of the construction company, the type of the complaint (i.e., formal or non-formal), and a thorough description of the complaint. N-grams were employed to analyze the complaints, detect trends, and compile a list of the most frequent concerns reported by the workforce. The analysis of the complaints data identifies safety practices that were most violated, highlights major safety and health concerns for construction workers, and pinpoints geographical areas that have seen a surge in complaints. The study also synthesized the existing research corpus and compiled a list of 100 best practices that construction employers can adopt to mitigate the concerns of the workforce. The findings of this study provide insights into the safety and health trends on construction sites, lay the foundation for future work of academicians and practitioners to address the concerns faced by construction workers, and serve as lessons learned for the industry in the case of any future pandemic.
Building information modelling (BIM) is one of the new technologies that, despite its perceived benefits and positive impacts towards the project objectives, has a very low level of adoption. The main problem with this issue may be attributed to several potential risk factors that disrupt the implementation of this technology. Previous research studies have identified various significant risk factors for implementing BIM technology, however, the relationships between these risk factors have not been evaluated and analyzed. This paper aims to identify and evaluate the critical risk factors (CRFs) for BIM adoption via several rounds of Delphi surveys. A total of 52 potential risk factors were identified and classified by an extensive desktop literature review. The analysis of Delphi questionnaires, which were distributed and responded by a panel of BIM experts in three rounds, identified 36 major factors as CRFs of BIM. Then the relationships between these 36 CRFs were determined and assessed by using the decision-making trial and evaluation laboratory method (DEMATEL). The results showed that the CRFs such as: lack of knowledge of BIM and need for software training, resistance to change, and lack of skilled BIM architects/engineers have the most profound impact and interaction with other risk factors. The identification and prioritization of the CRFs can enable BIM users to conduct a systematic risk management and analysis and develop appropriate effective strategies for mitigating the potential risks associated with BIM implementation in a proactive manner.
In recent years, the Zayanderood River in Isfahan-Iran has been encountered by hydrological imbalance and drought. Literature review shows that long-term climate change, drought, and disruption of the river's water supply has led to depletion of underground aquifers and, consequently, gradual subsidence of the river and serious damage to old buildings and structures along the riverbank. This fact would be followed up by adverse environmental, social, and economic effect that could threaten the sustainable development of urban space. Therefore, it is necessary to use efficient risk identification and assessment approaches toward a more effective risk management. The goal of this study is to identify and prioritize the risks of river drought with regards to all three sustainable development areas including environmental, social, and economic. The research methodology was a mixed field method that included a set of questionnaires and interviews. To evaluate collected data, the analytic network process (ANP) method was used. Eighteen important risks were identified. Based on the results, decrease in the groundwater level, climate change, and gradual soil degradation were ranked first, second, and third, respectively. As this study examined the impacts of river drought on all three areas of sustainable development simultaneously and comprehensively, it is expected that the results will fill the existing theoretical and practical gap affecting improvements in assessment and management of sustainable development risks.
The complexity of public–private partnership (PPP) projects ensures that risks could emerge and spread in unpredictable ways if they are not well identified and managed. The emergence of PPP projects has brought major changes in the construction industry, the most notable being in procurement methods influencing risk allocation to private parties. Thus, it is crucial to have an effective risk management for public and private partners to eliminate or minimise risks. Formulating an effective risk management system is a crucial challenge faced by both of parties in order to minimise or optimise risks. The aim of this study was to investigate the process of risk identification of private partners in Malaysian PPP projects. Data were collected throughout a 2-month period using a survey with a sample of nine Malaysian companies engaged in PPP projects, and the survey results were analysed using mean scores. The findings indicate that due to a lack of knowledge and experience of Malaysian private partners in the risk identification process, a comprehensive database for risk identification is highly necessary for the private sector. Another issue emerging from the findings is that it may be reasonable to use a combination of risk identification tools for PPP projects with a high level of complexity. The findings of the present study can greatly assist public and private partners to select the most appropriate tools for risk identification at the early stages of PPP projects.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.