This paper researched the high press and broken drift deformation mechanism of 1424m filling roadway by theoretical analysis and on-site monitoring. Strengthening rock residual strength by improving roadway pressure contributed to enhancing drift stability. The roadway deformation could be controlled effectively with the method of improving rock self-carrying capacity. The monitoring results showed anchor supporting resistance and reinforcement depth were inadequate. And supporting method was not coordinate with rock deformation, which was the main reason of roadway deformation increasing gradually. Improving bolt pre-stress and increasing the anchoring range are the key to limit roadway deformation. And the support way should provide a greater supporting resistance. It recommends that the combination reinforcing method, "strong prestressed anchor + long cable+ grouting behind the surrounding rock" is appropriate for controlling the drift displacement, and it can save supporting costs 390 yuan per year for per meter drift compared with previous supporting way while reaching the same effect.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.