In view of the lack of theoretical research on plane equilibrium injection-production adjustment in water drive reservoir, the production prediction method under the condition of variable pressure difference of production well is deduced according to Buckley Leverett non-piston displacement theory. Taking the same degree of extraction as the goal, the adjustment method of plane equilibrium injection-production per unit time is put forward. The evaluation coefficient of the optimal equilibrium injection-production scheme is defined, which can guide the optimization of the equilibrium injection-production scheme. Through theoretical model analysis, it is considered that the adjustment method of plane equilibrium injection-production is reasonable and reliable. Seven kinds of adjustment schemes are designed for BZ oilfield in Bohai Sea. Of equilibrium displacement time. When the equilibrium displacement time is more than 10 years, the increment of recovery degree slows down to about 1.8%. Equilibrium injection-production adjustment was carried out for 1195 sand body in BZ oilfield. The sand body increased oil by 25m3/d per day, and the natural decline rate decreased by 1.1%.
BZ Oilfield is a medium-sized oilfield with shallow delta facies deposits in Bohai Bay of China, compared with fluvial and delta facies oilfields, there is no mature experience for reference of reservoir configuration, well pattern arrangement and development model in offshore oilfields in China.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.