These days, geographic information system has released in everyday life and industries. However, the shipyard only uses it to manage the layout of the yard. In this study, we apply the Geographic Information System to shipbuilding block logistics simulation to analyse the behavior of bogies and forklifts carrying blocks and materials in the shipyard. The shipyard manages daily block logistics plans at the execution planning stage. However, since it is a daily plan, it is difficult to respond to an unexpected situation immediately, and application to judge a certain value or higher value is insufficient. Therefore, a simulation model was created using the shape and attribute information inherent in the geographic information system to verify and improve the block logistics of the mid-and long-term yards. Through this simulation model, we will analyse loads on the workplace, stockyard, and road, and contribute to overall logistics improvement from the point of view of resource planning. In addition, the results of the simulation are reflected in the planning, to help support various decisions.
This is an Open-Access article distributed under the terms of the Creative Commons Attribution Non-Commercial License(http://creativecommons.org/licenses/by-nc/3.0) which permits unrestricted non-commercial use, distribution, and reproduction in any medium, provided the original work is properly cited.Generally, the shipbuilding industry has finite resources and limited workspace. Due to finite resources, limited workspace and state of block preparation, erection process in shipbuilding industry is frequently delayed than erection process scheduling which is planned at long-term plan stage. In this study, considering variability of block reserve ratio, the degree of delay in real erection process is measured and compared to scheduling which is planned at long-term plan stage in shipbuilding industry including finite capacity and variative lead time. Also, the erection process scheduling which has minimum lead time can be checked through simulation. The results of this study could be improved the accuracy of erection process scheduling by checking the main event compliance ratio by block reserve ratio and calculating the optimum erection pitch for the main event compliance.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.