A Major Operating Company in UAE planned and drilled a challenging 6 inch horizontal drain after crossing twenty-seven formation sub-layers. The heterogeneity of pore pressure varied from equivalent mud weights as high as 10.6 ppg to as low as 7.1 ppg across the exposed reservoirs. Control of the equivalent circulating density (ECD) values to safely drill across these multi-reservoir sections and diverse reservoir pressures was one of the top challenges on this well, as the fracture gradients (FG) ranged from 13.5 ppg across the competent reservoirs to as low as 11ppg across the fractured reservoir section. The offset well data review show that 4 out of 6 wells encountered moderate, severe and total losses with mud weight (MW) ranging from 11 ppg to 11.3 ppg, which were cured by using heavy LCM treatments and in some cases, after several failed attempts to cure losses, cement plugs were used. Historically, the average time spent curing total losses in these wells varied from 2-3.5 weeks causing well cost increments as consequence of this non-productive time. All of the above, without mentioning the extra efforts, resources and risks were faced due to well control and stuck pipe events which occurred on those wells. Engineering and Operation teams worked together to engineer a solution to drill this well in one run while safely maintaining the well under control and managing the losses. The Bottom Hole Assembly (BHA) was designed to withstand the well challenges including multiple contingency options. These options allowed:Improving hole quality while tripping using a special type of eccentric reamer stabilizer.Pumping various LCM concentration scenarios through a multi-cycle circulation valve. In addition, a special type of float valve was placed on the top of the BHA as barrier, stopping back flow under surface backpressure or kick scenarios.Optimizing mud weight by using formation pressure while drilling (FPWD) and monitoring both equivalent circulating density ECD and equivalent static density (ESD) by pressure while drilling tools. The drilling fluid was loaded with non-damaging loss circulation material without compromising the MWD/LWD limits. Additionally, the mud rheology was carefully selected and monitored to achieve the desired ECD. On surface, a managed pressure while drilling system was deployed to give control on reservoir pressures. In instances of influx, MPD allows to early detect any kick and controlled by surface back pressure without requiring shut in for applying standard well control techniques. Keeping the well under control by surface back pressure (SBP) during connections time (flow–off). Additionally, MPD also enables the contingency of applying pressurized mud capping in case of unable to control the losses. As decision point, a loss management plan was prepared and implemented. Also, a dynamic formation integrity test was planned and performed to calibrate the fracture gradient across the loss zones. The problematic zone was successfully drilled with one BHA in under six days (5.73 days). The estimated savings for the company were 8 days, which equates to ±1MMUS$ after including the MPD cost which increased the well cost by 200MUS$. To further complement the outright savings, the engineered solution managed to safely stave off operational complications as well as incurring the related complexities and non-productive time (NPT) as recorded on the offset wells. Additionally, well was successfully landed and geo-steered across the target formation and 4½ in liner was run and cemented off-bottom avoiding the need to develop a slot recovery scope on this well with an extra duration of +/-35 days. The engineered solution provided a high level of preparation and contingencies within the BHA, Managed Pressure Drilling Equipment, real time monitoring, mud and cement formulation. The applied techniques allowed the operating company to successfully execute this challenge well within the proposed time and budget.
In oil and gas drilling, consistency of performance delivery heavily depends upon rig capability and its ability to maintain performance assurance through its execution cycle. It's not an uncommon occurrence that a rig is found with an underperforming top drive, one such scenario was observed in an in-fill oil well drilling project. This project was essentially drilling horizontal wells with bottom hole assemblies which had primary drive mechanism as a top drive. The rig in question was struggling to provide not only the requisite RPM but also not been able to deliver consistent torque needed to drill the well. This study analyzes how severe rig limitations were overcome through an optimization plan in which most optimal BHA was designed and drilling practices were customized for safe and successful execution of wells. In order to understand root cause of the challenge, an offset well analysis was conducted, it identified that high torque was mostly generated while drilling through inter-bedded formations which typically caused top drive to stall. In addition, multiple tool failures were encountered due to the high stick slip which rig couldn't mitigate due to the low RPM yield of the top drive. To manage the rpm and torque limitations, a motorized RSS BHA was designed as a solution. Further, based on micro-stall events of motor only BHA's across the inter-bedded formations in the field, a stick slip management tool was placed below the motor so that a potential twist-off and/or motor damages can be avoided. Also, different bottom hole assembly's drilling dynamics response were analyzed to come up with optimal stabilization and connection practices to avoid back reaming while trip outs. This paper would showcase actual results which highlight improvements achieved in stagnant drilling performance of the project. The analysis would demonstrate how multiple wells were drilled in one run following the risk assessment developed from the optimization study and subsequent real time monitoring of mitigating actions while execution. The comprehensive bottoms-up drilling optimization approach helped save 4 planned days for each well, this really paves way to pursue applied-engineering solutions to achieve step change in drilling performances, especially on rigs which are severely limited either due to capacity or malperformance issues. The bottoms up approach taken to understand the drilling challenges followed by a methodical approach to address each of the challenges demonstrate importance of effective pre-job planning. Learnings from this study can be adopted as a template to mitigate similar drilling challenges.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.