After several downhole sand control failures in subsea wells,1 the Okwori field development underwent a significant change of direction both topside and sub-surface. Numerous constraints were taken into account and successfully managed: tight rig schedule, complex logistics, contractual issues, etc…. Downhole, the original multi-zone, fully selective sand control completion system hat included sand screen expanded inside casing was abandoned. A new system was designed that allowed similar selectivity but with open-hole sand control. The new completion system implied a change in drilling practices, reservoir drill-in fluid and cake cleanup techniques that required simultaneous engineering. These in-depth modifications were designed and implemented in a matter of months. Topside, the FPSO had not been equipped to deal with sand production since downhole sand exclusion was assumed to be reliable enough. A sand management study recommended a series of modifications that minimized production shut-down while safely handling the produced sand and oil. Test de-sanding using a temporary sand trap determined that sand produced from weak formations could be stabilized. Severe service chokes were installed allowing production at a constant liquid rate. Experience accumulated to date highlights the importance of appropriate planning and application of reliable technical solutions in subsea completions. Introduction Due to the high associated costs, subsea well development concepts are usually "interventionless". The initial costs of these wells are mainly due to the mobilization and day rates of sophisticated drilling rigs. To re-enter subsea wells, similar rigs are required, hence the prohibitive cost of well intervention1. This is the driver behind declaring these wells "interventionless". Once the "interventionless" nature of these wells has been stated, it is presented as a challenge to well engineering. To provide a reliable solution, the most robust techniques for construction and completion are required. As subsea wells are expensive, each completion must give access to sufficient reserves for economical justification. in sacked and compartmentalized structures, sufficient reserve per completion means complex wellpaths penetrating multiple targets as beads threaded into a necklace. When co-mingling is not an option and sand exclusion is required, these wells also become host of expensive jewelry. We know since 1948 2 that more equipment is run in a hole, the more can and will go wrong. Hence the interventionless concept becomes the "Quest for the Holy Grail" of engineering. This pursuit translates into a risk based search for the best engineering practices and proven technologies that are compatible with the project economics, combined with best practice implementation. Risks that could adversely affect the project must be mitigated and required measures must be implemented so that the project remains economical throughout its life. In the Okwori project offshore Nigeria, the Addax Petroleum and service provider personnel tackled all of these issues in record time. A Complex Subsurface Okwori subsurface is far from the traditional image of a big oil anticline into which wells are positioned to maximize recovery. Okwori field is a chaotic ensemble of superimposed hydrocarbon and water bearing pools that are separated by faults3. Today, more than 250 fault-dip closures have been identified, 59 of them with proved hydrocarbon content. For additional information, please refer to references 3 and 4. Figures 1 and 2 illustrate the highly compartmentalized nature of the field both laterally and in depth. To access these scattered reserves the development plan called for dispersed well-head locations, hence a subsea development with each well being individually tied back to a central floating production separation and offloading vessel (FPSO).
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.