TX 75083-3836, U.S.A., fax 01-972-952-9435. AbstractThis Session paper will review the planning, preparation, and execution of the installation of the Independence Hub facility in Mississippi Canyon Block 920. The scope of the paper will encompass the transport and installation of the suction piles, the transport of the integrated facility to the offshore installation site and the installation of the polyester moorings and steel catenary risers in record water depths.The focus of the paper will be to highlight the use of existing technology and some innovative solutions to accomplish the installation of a facility that challenges existing Gulf of Mexico equipment depth and capacity limits. The results will show that the methods employed minimize costs and improve construction and installation efficiency.The paper will identify the importance of technically sound but simple design concepts and operations plans required for an installation in 8,000 ft of water with specific contributions regarding transportation stability, polyester mooring deployment/construction-stretch removal, and deepwater SCR retrieval and transfer.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.