Three problem areas exist in designing and implementing a kanban controlled JIT system: the identification of flow lines problem, the flow line loading problem and the operational control problem. This paper addresses the operational control problem. A general N-stage serial production system is modeled as a discrete time Markov process. Capacity constraints, stochastic machine reliability and demand variability are included. The model is illustrated by a 3-stage system, describing the effects of the number of kanbans, the machine reliability, the demand variability and safety stock requirements on the performance of a kanban controlled pull system.kanban system, production/inventory, Markov process
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.