Since the drilling started on the remote artificial islands located in UAE the operator used multiple initiatives to enhance the performance. One of them was the development of Operational Performance Improvement Plan(OPIP) targeting key aspects of the well planning and construction with an aim to improve the performance and reduce cost. The paper describes the thought process and steps taken to implement the OPIP and bring the performance to the new level for the operator. The main objective in harsh economic conditions was to construct the wells safer, with less cost and more efficiently. To achieve the goal, several well construction optimization workshops were organized aiming to change the drilling processes, operations procedures, tools, equipment and well design, as well as to have a clear plan on smooth expanding the extended reach drilling envelop. As a result, the operational performance improvement planwas developed and joint well engineering, subsurface and operations team was set to ensure the implementation. The main purpose of the plan was the standardization of all processes between few rigs, elimination of non-necessary activities and utilization of fit-for-purpose tools during execution phase. The OPIP had over80 items, and everyone of them was targeting specific drilling / completion activities. As part of the implementation, the process required a multi-discipline approach including but not limited to drilling, completions, equipment, subsurface, production, rig and service contractors with subsequent small task forces and focal point assigned to each individual action for time delivery, follow up and closure. At the same time not all the initiatives were implemented – some were rejected due to significant increase of operational risks and / or due to HSE associated risks. The process uses a live tracker and it resulted in significant performance improvements, when time for some operations decreased by 25%(i.e. blow out preventer test time), some activities were eliminated (i.e. wiper trips), drilling practices were completely changed (i.e. use of integral packer) and as a result, the project duration was reduced by one year as of to date. The manuscript describes a structural approach to the optimization of the well construction process with an objective to improve time and cost associated. The proposed ideas can be used at any project worldwide, especially on high cost, extended reach wells drilling projects.
From the start of the drilling campaign on the remote Satah Al Razboot (SARB) artificial islands located in United Arab Emirated (UAE) the operator used multiple optimization initiatives to enhance drilling performance and well delivery. Even though the complexity of the wells increased over time, when extended reach drilling (ERD) envelop started to expand, with the implementation of optimization initiatives the well construction time significantly decreased. This paper describes the way of thinking and steps taken to boost the performance to the absolutely new level for the operator. The main objective in actual harsh economic conditions was to drill the wells under the budget without jeopardizing well integrity, service quality and HSE. The ultimate goal was to decrease well construction time by 25%. To achieve this goal, several well construction optimization workshops were organized aiming to challenge and find improved drilling processes, operations procedures, tools, equipment and well design, as well as to have a clear plan on smooth expanding ERD envelop. In addition with the workshop initiatives, an Operational Performance Improvement Plan was developed aiming to analyzed all operational opportunities to reduce time; a dedicated well engineering, subsurface and operations team was set up to lead the feasibility studies and ensure the implementation of the approved initiatives. Implementation of all performance improvement initiatives required a balance between all involved parties. Every decision should be verified by multiple teams, included but not limited by drilling, equipment, completion, subsurface, production and intervention. Once the approval is obtained then the initiative is implemented and analyzed, taking into account increasing complexity of the wells and lesson learnt captured. At the same time not all the initiatives were implemented – some were rejected due to significant increase of service quality risk; some due to HSE associated risks. The implementation of the initiates and ideas contributed to the reduction of flat time, elimination of online operations, etc. The manuscript describes the steps taken to drill extended wells within shorter time compare to standard deviate and horizontal wells. It highlights main challenges faced during implementation of the performance improvement plan and describes techniques and technologies used to overcome them.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.