In August 2010, the fourth runway called D-Runway (2,500-m long) was completed off the shore of the Tokyo International Airport (Haneda Airport), which is the fourth largest airport in the world in terms of passengers handled. Since the D-Runway is situated at the mouth of the Tamagawa River, a hybrid structure combining a piled-elevated platform and land reclamation was planned so that it would not obstruct the flow of the river. In the reclamation area, a slope-type rubble mound seawall was constructed on the soft clay seabed, which was improved using the sand compaction pile method, with a total of 52 million cubic meters of soil, sand and rock used in the land reclamation. The piled-elevated platform is a massive 520,000-m 2 structure in which 198 prefabricated steel jackets supported by 1,165 steel-pipe piles were connected together by welding on site. This project required huge quantities of construction materials, including 470,000 tons of steel and 450,000 m 3 of concrete. The D-Runway was successfully constructed in just three and a half years thanks to the rapid construction method and a continuous 24-hours-a-day work schedule. This paper outlines the D-Runway project and its main structures.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.