In this study, a method was developed to address the automated guided vehicle (AGV) transportation scheduling problem. For deliveries in factories and warehouses, it is necessary to quickly plan a feasible transportation schedule without delay within a specified time. This study focused on obtaining a transport schedule without delay from the specified time while maintaining the search for a better solution during the execution of the transport task. Accordingly, a method was developed for constructing a solution with a two-dimensional array of delivery tasks for each AGV, arranged in the order in which they are executed, as well as for searching for a schedule by performing exchange and insertion operations. For the exchange and insertion, a method that considers the connectivity between the end point of a task and the start point of the next task was adopted. To verify the effectiveness of the proposed method, numerical simulations were performed assuming an actual transportation task.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.