THE PURPOSE. Consider the structure of the centralized and autonomous power supply system for gas field (GF) №1 of «Gazprom dobycha Yamburg» LLC. Perform the calculation of the main energy indicators (consumed active, reactive and apparent power, power factors, reactive power factors) for each section of busbars (SB) of complete transformer substations (CTS) according to wattmetrograms taken by electromechanical meters on the linear cells of closed switchgear (CS) during a calendar year. Calculate the peak current of a group of electric receivers (ER) for each CS CTS. To analyze the features of the functioning and the load factor of the autonomous power supply system from diesel power plants (DPP) according to the schemes: “one generator - a separate group of electrical consumers” (EС-1) and a single generation center with a cascade (ring) switching circuit (EС-2). Compare the annual fuel consumption of diesel power plants with EС-1 and EС-2 by monthly load factors.METHODS. When solving the problem, an approximate method was used to determine the energy indicators of electrical loads at each CS CTS and the load factors of DPP according to the readings of active power (wattmetrograms) for the period under consideration.RESULTS. The article describes the relevance of the topic, considers the features of the construction and functioning of the EC for a centralized and autonomous power supply system. An approximate calculation of the energy parameters at the each CTS SB of the integrated gas treatment plant (IGTP) and the booster compressor station (BCS) was made based on the readings of the active power consumed during the period under consideration. This article discusses the fuel and energy characteristics and features of the functioning of DPP. The monthly and annual weighted average load factors were calculated and the peak currents of the ER group were determined for each DPP. The calculation of the annual fuel consumption of DPP with EС-1 and EС-2 has been made according to monthly load factors.CONCLUSION. As a result of the analysis of the structure and energy characteristics, the features of the functioning of the centralized and autonomous power supply system were revealed, which determine the range of problems and shortcomings that require further research and study, with the subsequent development of a set of measures to improve the energy efficiency of the EC.
THE PURPOSE. To develop a model in MATLAB/SIMULINK environment for the system of mechatronic movement modules (MMD) of the electrical complex, which includes gas air coolers with centralized system of power supply of the gas field 1 of "Gazprom dobycha Yamburg" LLC. To analyze the energy efficiency of MMD ETC ACHE. To perform the experimental research of the EMD EMD ETC ACHE model in the dynamic modes in order to determine the regularity of the influence of single (group) starts on the power supply source overload. To develop a switching algorithm for MMD ETK AHE at direct starts of asynchronous motors (AD), providing restoration of the technological mode within the optimum time after the voltage disappearance for the centralized power supply system.METHODS. The results presented in work are received with use of methods of the theory of electric and magnetic circuits, the theory of electric drive and electric machines, methods of optimization of power supply systems, analytical and numerical methods of applied mathematics, methods of mathematical and computer modeling.RESULTS. In article urgency of a theme is described, features of construction and modelling of ETK GP in the environment MATLAB/SIMULINK with the centralized system of power supply are considered. The comparative analysis of existing methods and calculation of parameters of the substitution schemes of the MMD ETK GP was carried out. Approximate calculation of mechanical and inertial characteristics for creating a model of load (resistance moment) for the motor. The model of EMD of electric motor drive compressor unit was created, as close as possible to the real existing system on the basis of catalog (passport) data of individual elements of electric motor drive unit. There were analyzed and developed proposals to enhance power efficiency of EMD ETC AHE and algorithms, which provide optimal direct start-up of the AHE fan group within the set time after the power failure without overloading of the power supply source, were proposed.CONCLUSIONS. On the basis of results of computer modeling, the peculiarities of operation of EMD ETH ACHE, which require further study and development of corrective measures to improve energy efficiency and reliability of power supply system of GP. Combination of direct starts of single (group) fans of ACHE, obtained at this stage of research of EMD EMD ETC ACHE model, will create the basis (algorithm) for automated control system of this complex, which will ensure restoration of technological mode within optimum time after power outage without overloading of centralized power supply source. Calculation of parameters of individual elements of MMD model of ETC AVO will allow to use data to create other models of ETC GP, which will allow to conduct in-depth research and improve the energy efficiency of the entire system of power supply of GP.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.