The traditional construction method of a nuclear power plant is to build a factory building and a containment, and then put the key structure into the containment. From the AP1000 project, the open-top construction scheme is adopted. The open-top method can quickly hoist key structure, but the construction process, tooling and other equipment need to be changed. It is challenging for units that have no open top construction experience. This paper simulates the overall assembly and hoisting construction of the bottom pool for a nuclear power project. For the overall assembled tooling, the design scheme is verified; for the overall lifting of the pool, the problem of the construction plan is discovered in advance, and the hoisting construction plan is improved.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.