An automated guided vehicle-based flow production system is used for manufacturing prefabricated bathroom units. One unit can occupy a space of more than 10m 2 . Due to large time deviations in sequential processes, queues are formed and greater plant space is needed. Reducing work-in-progress helps to save plant space but renders manufacture less efficient. The research explores better workstation arrangements. An open queuing network model was used to approximate the flow production system. Since the problem of workstation arrangement is a combinatorial optimisation problem, simulated annealing was applied to search for a good solution. The combination of an open queuing network model and simulated annealing provides a powerful tool to solve the facility layout problem for a stochastic flow production system. The experimental results show that the proposed approach has potential to guide industrial layout design and practice.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.