Abstract-In this work flowsheet simulation of a coal fired power plant retrofitted with a CO 2 capture unit has been carried out in the AspenPlus process simulator platform. The simulation is an attempt for the detailed process involved in CO 2 capture starting from generation of flue gas, CO 2 capture by monoethanolamine (MEA) and regeneration of solvent using unit operation models available in Aspen Plus and appropriate calculator blocks wherever necessary using FORTRAN codes. The parametric study includes effect of absorber column height, regenerator pressure, on reboiler heat duty and power plant efficiency. Parametric study such as energy penalty on the power plant, reboiler duty of the capture unit, evolution of energy requirement has been done and presented. The contribution of desorption energy is about 47% of the total capture energy and the power plant penalty is about 30% lower when low pressure steam has been utilized to supply heat energy to reboiler. Index Terms-CO 2 capture, MEA, absorption, coal-fired power plant, simulation.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.