The $2200 million Ghazi-Barotha hydro-power project—one of the largest currently under construction worldwide and expected to be completed in about 2002—will have a peak generating capacity of 1450 MW and provide an estimated annual energy output of 6600 GWh. Its main components are a gated barrage and flow diversion structure on the Indus River at Ghazi, about 7 km downstream of Tarbela dam a 52 km long power channel with a discharge capacity of 1600 m3/s, bypassing a relatively steep reach of river, including Attock Gorge a five-unit powerhouse, discharging back to the Indus at Barotha via a 2 km long tailrace an ‘emergency’ spillway providing a bypass to the powerhouse two ‘headponds’ upstream of the power intake, to provide sufficient daily storage to support diurnal ‘peaking’ of the units. The project has a number of interesting hydraulic features, many of which were developed with the aid of about a dozen physical model studies. This paper includes a brief description of the project, outlining the role of most of the model studies and then describes two of them in greater depth.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.