This research located in Beruang Block Kalimantan. The purpose of the mine drainage planning system is to control runoff water. Therefore, an excellent drainage system is needed without interfering with mining activities such as runoff water pollution, which could cause contamination in the surrounding area and outside the mining sites. Based on the analysis of rainfall data of 2009-2020, the precipitation plan was 341.67 mm/day; the concentration time was 2.37 h, the rain intensity was 41.06 mm/h, and repeated rain periods were 2-years. The extensive catchment area was 1.52 km2 because the runoff entering the sump was 44.38 m3/h. To prevent the water from entering the mining area, an open channel was made around the mine openings, and the water flows naturally into the sump. The water pumped into the settling pond with the pump type Allight HL 150MHD-IT at 50 m/s for 3-days with a single rain, resulting in total water volume of 17,556.5 m3/day. A trapezoidal shape was designed for a sump with dimensions of 3.96 m in length and width at the surface, 1.79 m length and width at the base, and 1.03 depth.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.