The "M" field is located offshore East Malaysia, with a major lateral fault separating the field into North and South. The south area main reservoirs are I, K and L with strong water drive and highly unconsolidated formations. These reservoirs contain approximately 200 MMSTB STOIIP with a current recovery factor of 24%. The major challenges in this field are (1) high well deviation, (2) sand production and (3) early water break-through. In order to dynamically mitigate these challenges, a pilot well with intelligent well technology was considered for one of the new highly deviated infill wells which targeted 3 producing zones. A combination of cased-hole gravel-packing and open- hole stand-alone screens (SAS) was installed at the reservoir sections. This Intelligent Completion IC system is equipped with innovative multi-drop hydraulic modules. The first IC system, successfully installed 2 years ago in 2 wells of an offset field pilot, has had a significant impact on production to date. These systems used the conventional control line configuration of an N+1 system, where N = the number of zones to be completed. However, the newly installed IC system provides an engineering solution to reduce the required number of control lines from 4 to only 2 to control 3 zones, i.e. an N-1 control line configuration. This innovative solution was essential to the project to avoid modifications to the wellhead due to the short lead-time before the installation. This solution also reduced the installation time compared to the first edition of the IC system. This paper highlights the screening process for candidate selection and the successful installation of IC system in multi stack reservoirs with gravel pack assembly and also the lessons learned from the full collaboration between the project team and service provider.
Produced fluids, from a number of wells completed in a sour reservoir in a giant field in Kuwait contain varying concentrations of H2S, with levels ranging from 1% (10,000 ppm) to 3% (30,000 ppm). This souring problem made the concerned reservoir undeveloped fully for many years since there are currently no adequate surface facilities and system in place to handle such high amount of H2S. In order to dynamically mitigate these challenges, a pilot trial of an innovative technology was considered in one of the wells within this field, which has 1.3% (13,000 ppm) H2S concentration. The outcome from this pilot was very encouraging and promising as the H2S level was reduced to the expected set level on a fully automated basis. This paper highlights the screening process for candidate selection, technical design considerations, KOC-HSE regulations and the successful implementation of this new system on a single well basis and also the lessons learned from the full collaboration between the project team and service provider.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.