Selection of optimal tunnel route and tunnelling methods for head raise tunnel of a hydropower project is one of the most critical and complicated steps in its design stage. Since factors involved are highly diversified, the decision making process is quite complicated. In this study, the Analytical Hierarchy Process (AHP), a multi criterion decision making tool was employed to establish the optimal tunnel route and the most appropriate tunnelling method for the established optimal tunnel route. The optimal tunnel route was established by evaluating two tunnel route options with ten factor criterion. Four tunnelling alternatives were evaluated against relevant ten factor criterion in selecting the most suitable tunnelling method for the selected optimal tunnel route. Criterion were limited to geotechnical, geological, geomorphological, safety, technical, economical and socioenvironmental aspects. Analysis reveals that, route B, which is having the overall composite weight of 0.513 (51.30%) is the optimal tunnel route and combination of Drill & Blast method (section III of route B) and New Austrian Tunnelling Method (sections I and II of route B) is the most appropriate tunnelling criteria along the selected tunnel route.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.