This is a PDF file of an unedited manuscript that has been accepted for publication. As a service to our customers we are providing this early version of the manuscript. The manuscript will undergo copyediting, typesetting, and review of the resulting proof before it is published in its final form. Please note that during the production process errors may be discovered which could affect the content, and all legal disclaimers that apply to the journal pertain.
AbstractWhen scheduling projects under resource constraints, assumptions are typically made with respect to the resource availability and activities are planned each with its own duration and resource requirements. In resource scheduling, important assumptions are made with respect to the staffing requirements. Both problems are typically solved in a sequential manner leading to a suboptimal outcome. We integrate these two interrelated scheduling problems to determine the optimal personnel budget that minimises the overall cost. Integrating these problems increases the scheduling flexibility, which improves the overall performance. In addition, we consider some resource demand flexibility in this research as an activity can be performed in multiple modes. In this paper, we present an iterated local search procedure for the integrated multi-mode project scheduling and personnel staffing problem. Detailed computational experiments are presented to evaluate different decomposition heuristics and comparison is made with alternative optimisation techniques.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.