One of the highest profile extended reach drilling (ERD) oil projects in the world is presently operated by Saudi Aramco. It is being developed with a large number of horizontal ERD wells targeting a carbonate reservoir; classified according to the well objectives as producers or injectors. The wells are being drilled from land locations, artificial islands and offshore platforms which increase the complexity and challenges of the project. The production and well delivery requirements for the development phase were planned with very ambitious targets. Therefore, multiple drilling and completions technologies have continuously been pursued to achieve the planned schedule.During the past years, the drilling team planned to take this project to the next level by drilling and completing the longest horizontal ERD well in Saudi Arabia (M-1) to a total depth (TD) of 37,042 ft MD with an open hole completion of 10,002 ft. To achieve this and to push the drilling envelope to that extent, many drilling challenges were expected and new approaches, procedures and technologies were deployed to overcome them.The main challenges were related to torque and drag limitations for drillpipe and casing runs, losses and wellbore stability considerations, hole cleaning and equivalent circulating density (ECD) management for stuck pipe prevention, drilling dynamics in harsh drilling environment, logging data transmission at deep intervals of the well and pushing the limit of drilling performance and equipment reliability. To overcome them, considerable well design changes were introduced, along with customized procedures and new technologies to ensure the safe and efficient delivery of this well. First, the well design was optimized and changed from a standard design to a deepened casing design, to cover unstable formations. Second, the drill string design loads were simulated through comprehensive torque and drag modeling to determine the components specifications and to develop safe running procedures. Third, well specific ERD hole cleaning procedures, ECD management guidelines and tripping roadmaps were implemented to deliver optimum hole condition and minimize stuck pipe risks. Finally, multiple drilling technologies, including rotary steerable systems, telemetry tools, sidetracking equipment and mud additives, were introduced to realiably deliver the well objectives.The optimization changes in the well design, procedures, practices and drilling technologies have resulted in delivering a number of records which include: drilling the longest well in Saudi Arabia safely and efficiently, installing the world's deepest 7-in. solid liner, achieving the world record for the deepest 6 1/8-in. lateral section and the longest 6 1/8-in. section for the project; and successfully running and setting the world's deepest 7-in. cased hole whipstock. These records are considered a step change for Saudi Aramco drilling operations and a new milestone for the ERD drilling industry.
Saudi Aramco operates one of the largest offshore oilfield developments in the world. This field is made up of 41 kilometers of causeway, 3 kilometers of bridges, 27 drilling islands, 13 offshore platforms, and 16 onshore drill sites. The magnitude of the field has pushed cutting edge technology and processes to the forefront of the industry. This new development has driven achievements in multilateral and extended reach directional wells. One challenge the operator faces is to maintain proper hole cleaning in extended 8½ in. tangent sections at a 85-87°inclinations, which are drilled in excess of 10,000 ft.Historically, drilling very long tangent sections required the use of several tandem sweep pills, wiper trips, and reaming/back reaming to maintain hole quality and efficiently remove cuttings bed from the wellbore. The negative effects of poor hole cleaning can lead to tight intervals, increased torque and drag, and eventually stuck pipe.In an effort to drill efficiently, utilization of a new technology to increase the cutting removal was trial tested on well A1 from an onshore location of the field. The ERD well, A1, was drilled to a total depth of 30,480 ft MD (8,650 ft TVD) into a stratigraphic environment composed of limestone, shale, and siltstone. The objective of the trial test for the tool was to improve the drilling efficiency. To obtain the best possible hole cleaning, a simulation was performed by placing the tools every three stands along the tangent section in the 8½ in. hole section.The goal of the trial test was to achieve the following:• Enhance hole cleaning by removal of cuttings bed.• Reduce the frequency/number of tandem sweep pills.• Reduce the frequency/number of wiper trips.• Reduce torque and drag and compare it with the offset wells.• Reduce drilling cost.A service company installed a cuttings flow-meter system at the shakers, which was used to evaluate the hole cleaning efficiency and performance of the hole cleaning tools. This paper will demonstrate the systematic methodology, which Saudi Aramco and the service company used to approach the utilization of the hole cleaning tools to achieve a clean hole in well A1.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.