Earthworks and earthmoving operations are a major part of many civil engineering construction projects. Because of their labour and plant intensity, the planning and estimating of such operations is crucial to both the cost and duration of the project; earthworks are considered by many practitioners to be indicators to the success or failure of the project as a whole. Traditionally, a mixture of manufacturers' data (through published charts or computer databases) and historical company data are used in the estimating of earthworks. This process has two main drawbacks. First, plant haul velocity is dependent on the rolling resistance at the soil-wheel interface, which is notoriously difficult to determine; second, the stochastic interface between types of plant provides a non-deterministic system, resulting in estimates of output which may be unrealistically high. An alternative system of earthworks estimating is presented based on a combination of work undertaken in both the soil/vehicle and stochastic estimating fields. This system is demonstrated via a case study based on an actual highway project. The main conclusion to be drawn is that the traditional estimating approach results in a scheme costed well below realistic values.Earthworks, Hauling, Rolling Resistance, Earthmoving Plant, Plant Cycle Times,
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.