The authors have been developing methods capable of deducing the Synchronized Multi-Site Scheduling using the interface matrix obtained from the relationship between preceding and following of the tasks for the construction work with a repetitive nature. In this study, several structural construction plans were estimated by carrying out simulations using the construction delivery time which are the criteria for the structural construction method plans, as objective variables. In this study, the Synchronized Multi-Site Scheduling method is in conjunction with the quantity information of the 3D model. Redefine the 3D model for using the technique of dividing and combining the 3D model utilized in the construction simulations. Various simulations are created by the 3D model is redefined with reference to the productivity data and unit price information. In concrete terms, the performance of each structural construction method plan was estimated by carrying out four process simulations for the skeleton construction work above the ground for a high rise RC office building using 1) site division 2) component division as variables.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.