This paper presents an integrated design and costing method for large stiffened panels for the purpose of investigating the influence and interaction of lay-up technology and production rate on manufacturing cost. A series of wing cover panels (≈586kg, 19·9m 2 ) have been sized with realistic requirements considering manual and automated lay-up routes. The integrated method has enabled the quantification of component unit cost sensitivity to changes in annual production rate and employed equipment maximum deposition rate. Moreover the results demonstrate the interconnected relationship between lay-up process and panel design, and unit cost. The optimum unit cost solution when using automated lay-up is a combination of the minimum deposition rate and minimum number of lay-up machines to meet the required production rate. However, the location of the optimum unit cost, at the boundaries between the number of lay-up machines required, can make unit cost very sensitive to small changes in component design, production rate, and equipment maximum deposition rate.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.