The Pyrenees FPSO development, located offshore Western Australia, produced first oil in 2010. By 2017, the topsides facility had became constrained by produced water production, reaching the facility design capacity of 110,000 bbl/d. A strong business driver was presented to debottleneck the water processing train to increase oil production, for which a holistic, system-wide approach was required. A series of brownfield debottlenecking scopes were identified and assessed using a systematic value versus risk approach. The key value drivers were recognised as incremental oil production, execution timing and cost. The assessment focused on improving Produced Water Re-Injection (PWRI) pump throughput and uptime, optimising the produced water treatment and overboard discharge systems, and the use of cargo oil tanks for separation. Project execution was phased to allow early debottlenecking gains to be unlocked as major modification scopes were progressed. The most capital intensive project executed was the installation of a side-stream Compact Flotation Unit package to polish and discharge produced water overboard. In combination, the projects delivered a 36% increase in produced water handling capacity to 150,000 bbl/d, accelerating 8.5% production over a 3-year period. In addition, the projects increased facility uptime by 1.8% and reduced the risk of late-life produced water injection system failures. This case study illustrates a logical and systematic approach to production debottlenecking, resulting in a significant production uplift, safely delivered for low relative CAPEX investment. The processes described and lessons learned in this project may be applicable to other maturing fields and facilities, and can be used to assist resolving late-life produced water challenges.
The Pyrenees development is located offshore Western Australia, and has been producing since 2010 under the operatorship of BHP Billiton Petroleum. Six heavily biodegraded, low GOR oil fields are developed by 19 horizontal production wells with reservoir sections up to 3000m long. Each field has between 1 and 6 gas lifted production wells connected by separate production and test flowlines to a Floating Storage Production and Offtake (FPSO) vessel. As field water cuts progressed above 10%, an increasing deviation between predicted and actual flowline pressure drop was observed and indicated the formation of emulsions in the wells production tubing and flowlines. The additional flowing pressure loss and consequent reduction in production rates formed the basis for a debottlenecking project to treat subsea emulsions. After identification of a suitable demulsifier chemical through laboratory testing, chemical treatment was initially undertaken via injection at the subsea manifolds. Initial demulsifier field trials yielded a 4% increase in field oil production. In an attempt to realise further pressure drop reduction, the opportunity for downhole injection at each well was investigated. As downhole chemical injection had been initially designed for scale inhibitor, flow assurance studies were performed to ensure repurposing the downhole lines would not result in an elevated calcite scaling risk in subsea equipment. Field implementation of downhole chemical injection across the available wells resulted in an additional 18% field oil production uplift, with individual wells achieving up to 50% increase in drawdown and 58% increase in liquid production. Additional benefits attributed to downhole demulsifier injection include improved gas lift efficiency and stabilised flow regimes and pressures observed at the downhole gauges and topsides risers. This paper provides a unique case study in opportunity identification and multifaceted problem solving to significantly and safely debottleneck production. An innovative solution was found by relocating the injection location and repurposing existing topsides and subsea equipment with very low additional capital investment. The lessons and processes used in this project may be carried across to other existing fields and facilities to assist identifying and resolving related flow assurance bottlenecks.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.