Reasonable production allocation of tight sandstone gas reservoirs is an important basis for efficient development of wells. Combining multiple mathematical models, the modified flowing material balance equation was established considering the variation of viscosity and compressibility, and a reasonable production allocation process was developed. The results show that: ① The flow material balance method ignores the change of compressibility, viscosity and deviation coefficient in the calculation. Compared with the results calculated by the material balance method, the results of the flow material balance method are smaller. ② A modified flowing material balance method is established, verified by the production of 670 wells in the study area during stable period. Compared with the open flow rate method, the error of dynamic reserve allocation method is smaller, with an error of 0.07%. ③ When dynamic reserves are used to allocate production, the initial decline rate of wells is reduced by 74.65% on average, the production on stable period increases by 21.28%, and the time increases by 1.79%. This study provides support for dynamic reserve calculation and reasonable production allocation of gas wells in the study area, and has important guiding significance for the formulation of reasonable development plan and economic and efficient development of tight sandstone gas reservoirs.
Based on static geology and dynamic production of typical wells in Yan'an gas field, a convenient method of the wells controlled reserves was established combining with material balance method (MB). The method was applied to 88 wells in Yan'an tight gas field. The results show that: ①Controlled by pore structure, wells are divided into three types based on the morphology of the capillary pressure curve and the analysis of the parameter characteristics, and their productivity is evaluated, respectively. ②The flow material balance method (FMB) ignores the change of natural gas compressibility, viscosity and Z in the calculation. After the theoretical calculation of 30 gas samples, the slope of the curve of the relationship between bottom hole pressure and cumulative production and the slope of the curve of the relationship between average formation pressure and cumulative production are not equal. ③Compared with the results of the MB, the result of the FMB is smaller, and the maximum error is 34.66%. The consequence of the modified FMB is more accurate, and the average error is 2.45%, which has good applicability. The established method is simple, only requiring production data with high precision, providing a new method to evaluate well-controlled reserves of tight gas sandstone. This method with significant application value can also offer reference values for other evaluating methods of well-controlled reserves.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2025 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.