Munga field of the Greater Nile Petroleum Operating Company (GNPOC) in Sudan has several wells that have commingle production from the Aradeiba, Bentiu-1 and Bentiu-2 formations. These formations are highly variable in terms of the reservoir properties, oil types and pressure regimes. Because of the contrast properties of different layers, the water cut phenomenon is relatively fast and severe which hampers the productivity and ultimate recovery of the individual well as well as the field.For effective Reservoir Management and to limit the declining trend of the field, Water Management Techniques are applied in some of the wells of this field. Information obtained in the process was used for reservoir model calibration, well productivity prediction, low productivity diagnosis, and generation of new drainage points and remedial action for water management. This paper discusses the technical details of three cases corresponding to the wells Munga-XX and Umm Sagura South-XX (USS-XX) and Munga-XY in which, a multidisciplinary approach has been implemented in order to determine depletion profile, produced oil and remaining reserves, locate any "by-passed" oil zones, determine oil and water contributions from each zone and shut off the excess water production while maintaining or increasing oil production.
Munga field of the Greater Nile Petroleum Operating Company (GNPOC) in Sudan has several wells that have commingle production from the Aradeiba, Bentiu-1 and Bentiu-2 formations. These formations are highly variable in terms of the reservoir properties, oil types and pressure regimes. Because of the contrast properties of different layers, the water cut phenomenon is relatively fast and severe which hampers the productivity and ultimate recovery of the individual well as well as the field.For effective Reservoir Management and to limit the declining trend of the field, Water Management Techniques are applied in some of the wells of this field. Information obtained in the process was used for reservoir model calibration, well productivity prediction, low productivity diagnosis, and generation of new drainage points and remedial action for water management. This paper discusses the technical details of three cases corresponding to the wells Munga-XX and Umm Sagura South-XX (USS-XX) and Munga-XY in which, a multidisciplinary approach has been implemented in order to determine depletion profile, produced oil and remaining reserves, locate any "by-passed" oil zones, determine oil and water contributions from each zone and shut off the excess water production while maintaining or increasing oil production.
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.
customersupport@researchsolutions.com
10624 S. Eastern Ave., Ste. A-614
Henderson, NV 89052, USA
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Copyright © 2024 scite LLC. All rights reserved.
Made with 💙 for researchers
Part of the Research Solutions Family.