Teratomas in an undescended testis are rare in infants. This report was the youngest case of immature teratoma originating in intra-abdominal undescended testis. A 3-month-old infant with cryptorchism was seen because of an asymptomatic palpable mass in the right abdomen. Ultrasonography and computed tomography revealed a multicystic large tumor with focal calcifications in the right side and serum tumor markers within normal limits. Complete resection of the tumor was performed and the histopathological diagnosis was made as immature teratoma of the right testis. Because retroperitoneal lymph nodes metastasis was observed in 3-month follow-up postoperatively, retroperitoneal lymphadenectomy and chemotherapy including bleomycin, etoposide, and cisplatin were performed. Presently, the infant has been free of recurrence for 3 years. We suggest that nonpalpable testis should undergo a careful evaluation and prompt resolution and that the subsequent finding of an intra-abdominal mass should make us think on the possibility of intra-abdominal testicular germ cell tumor. Postoperative adjuvant chemotherapy in combination with complete resection of the tumor is necessary for pediatric immature teratomas originating in intra-abdominal undescended testis.
This paper proposes optimal total planning for incinerator plants (IPs) in a typical urban area, which includes a method of determining the number of plants and the capacities of the IPs. Burnable municipal refuse is disposed of sanitarily by high-temperature incineration at the IPs. At the same time, power generation from waste (PGW) is being performed at many IPs to recover energy. At present, the amount of energy generated by PGW is greater than that of wind power or photovoltaic power generation. However, PGW has a limited generation efficiency and low generation output due to the smaller capacity of IPs. To overcome the above weakness, highly efficient PGW is necessary with total integration and scaling up of IPs. Regarding total integration and scaling up, operation in larger areas is favorable from the point of view of refuse volume and collection. In the planning stage, both the cost of IPs and refuse collection, which is important for refuse disposal, should be taken into account comprehensively. Optimal total planing for IPs can be performed in two stages. First, the disposal capacity G k of an IP versus the number of plants K is decided by constraints. G k is about the same for all K because of maintenance and refuse collection, and is greater than 300 tons per day in steps of 100 tons per day. G k should be decided not only by refuse volume but also by cessation of operation at plants due to maintenance or faults. Second, the cost of each value of K is calculated based on the construction and operating costs of the IPs, income from selling the energy of PGW, and refuse collection costs. Therefore, the value of K with the minimum cost is selected as the optimal number of IPs. A numerical simulation of an area with a population of 3 million indicates that the optimal plant number is 4. At present there are eight or nine IPs in cities of 3 million people. The above cost reduction effect will be about 15% from the present value. Considering the situation of aging IPs, a decreasing trend in refuse volume, and the stringent financial conditions of local governments, the proposed method is very effective and realistic. C⃝ 2014 Wiley Periodicals, Inc. Electr Eng Jpn, 190(2): 41-56, 2015; Published online in Wiley Online Library (wileyonlinelibrary.com).
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.